Public Transit Sector

 

Bloor-Yonge Station Capacity Enhancement

by AECOM Canada Architects Ltd.


Project Name

Toronto Transit Commission, Bloor-Yonge Station Capacity Enhancement / Toronto, Ontario


Project details

Publicized Budget: $1.5B

Project Timeframe: Mar 2020 – Jan 2021


 

Henry’s Official Title at AECOM: Personally Supervising and Directing (PSD) Architect

Informal / Effective Roles: Architectural Production Lead, 2nd in command of Architectural Team, Discipline Coordinator QAQC Primary Reviewer

About the Project: The Bloor-Yonge Station is the busiest station in the TTC portfolio and future projections demonstrate issues with capacity as ridership grows and the transit network expands. This project seeks to increase the passenger capacity of the station to address the anticipated increase in ridership for the future for what is essentially a critical node to Toronto’s public transit infrastructure.

Scarborough Station Expansion

by AECOM Canada Architects Ltd.


Project Name

Toronto Transit Commission, Scarborough Station Expansion / Scarborough, Ontario


Project details

Publicized Budget Range: $3.35B – $5.02B

Project Timeframe: June 2018 – June 2019

Project Status: on hold


 

Henry’s Official Title at AECOM: Personally Supervising and Directing (PSD) Architect

Informal / Effective Roles: Architectural Production Co-Lead, Shared 2nd in command of Architectural Team, Primary Discipline Coordinator QAQC Reviewer

About the Project: The Scarborough Centre Station is a proposed terminus station for the Scarborough Subway Extension and will include more than 2 dozen bus bays and subway station with integration into its bourgeoning urban landscape that is comprised of a mix of government, institutional, cultural, retail, employment, and residential uses located at the core of an established employment corridor along Highway 401.

Aldershot Station Renovation and South Parking Lot Expansion

by AECOM Canada Architects Ltd.


Project Name

GO/Metrolinx, Aldershot Station Renovation and South Parking Lot Expansion / Burlington, Ontario


Project details

Project Timeframe: Nov 2017- May 2020

Project Status: on hold


 

Henry’s Official Title at AECOM: Personally Supervising and Directing (PSD) Architect

Informal / Effective Roles: Architect-of-Record

About the Project: This project involves almost a complete retrofit of the interior Aldershot Station building, as well as the significant revisions to both south and north parking lots, with 2 new bus bays in the north and 500+ new parking spaces in the south with a new, large Kiss & Ride area. Included in this project is also the addition of two new elevators from platform level to the underground pedestrian tunnels to serve as redundancy lift access to the lower level, should the existing elevators break down. Henry has been given the architectural lead and be the Architect-of-Record for this project to take the design that was last approved by the client at 25% Design Development.

Feasibility Report on Platform Warning Lights at Union Station

by AECOM Canada Architects Ltd.


Project Name

GO/Metrolinx, Feasibility Report on Platform Warning Lights / Union Station, Toronto, Ontario


Project details

Project Timeframe: 2017


 

Henry’s Official Title at AECOM: Senior Architect – Quality Assurance / Quality Control

About the Project: This was a feasibility study of installing LED rail platform train movement warning lights at Union Station as an enhancement to GO passengers’ safety and accessibility.

Previous
Previous

Sports & Recreation

Next
Next

Urban